Monday, November 3, 2008

11/3/08 Science Syllabus

Mr. Morrell
Science Syllabus
Week of November 3, 2008
http://op97-morrell.blogspot.com

Important Information:
• All materials for mousetrap cars are due Friday, November 7. Don’t forget to bring in a shoebox to store your groups materials.
• Your first list of materials is due on Tuesday, November 4. Each group member needs a copy of the list and I also need a copy.
• Your first blueprint is due on at the end of class on Wednesday, November 5. Each member of the group should make their own blueprint- they should a similar design, but do not need to be exact. It should include a top and side view.
• Students will take a quiz on Speed, Velocity, and Acceleration after mousetrap car construction. We will introduce and revisit those concepts throughout the project.
• You must have your parent permission slip Today Monday Nov. 3
• Block Scheduling begins Mon Nov. 3 and goes until Friday Nov. 21
• We are not blocking Nov. 13th (fieldtrip) or Nov. 14 (I will be out that day). Also no school Nov. 11 due to Veterans Day
• Mousetrap construction all of this week!

Monday, November 3- signed parent letter due tomorrow today! (Period 1 and 2)
Begin speed and velocity Notes first 5 min
Review a bit of directed reading
Mousetrap Car groups are assigned
Work on 1st list of materials and blueprints
Continued discussion on Lab Report Requirements

Homework: Finish 1st list of materials- due next class

Tuesday, November 4 (Periods 3 and 1)
Speed and Velocity Notes first 5 min
Continue Discussion Lab Report Requirements
Period 1: Speed and Velocity Worksheet due next class, sign group contracts

Homework: Finish Speed and Velocity Worksheet (We didn't get to this, We will pick it up at a later date. It is a little too much during construction and I have decided to focus on the cars, the paper, and notes only and will continue with concepts toward the end of November.)

Wednesday, November 5 (Periods 2 and 3)
Mousetraps are due today.
Work on Blueprints- due at the end of class
mousetrap construction
Sign group contracts today

Homework: none

Thursday: November 6 (Periods 1 and 2)
mousetrap consruction


Homework: none

Friday, November 7 (Periods 3 and 1)
Mousetrap construction
All materials must be in class by today for everyone!


Homework: Have a GREAT Weekend!

No comments: